Salesforce

What does the Progress message 15194 signify?

« Go Back

Information

 
TitleWhat does the Progress message 15194 signify?
URL NameWhat-does-the-Progress-message-15194-signify
Article Number000150978
EnvironmentProduct: OpenEdge
Version 10.2B, 11.x
OS: All supported platforms
Question/Problem Description
What is the 15194 Progress message?
Steps to Reproduce
Clarifying Information
Error Message(15194) Database activity did not finish before the shutdown timeout expired so the database is performing an immediate shutdown.
Defect Number
Enhancement Number
Cause
Database shutdown has exceeded either the user defined shutdown time using the newly added option to proshut:  
-shutdownTimeout

or the default value of -shutdownTimeout (10 minutes) has been exceeded.
Resolution
The 15194 message is informational. It let's the DBA know that we exceeded the defined or default shutdown time. 

There is a new parameter in 10.2B, -shutdownTimeout, which has a default of 10 minutes. After ten minutes (or the user defined value) the database will kill all remaining users and shutdown. 
Workaround
Notes
References to other documentation:

Progress OpenEdge Data Magagement Database Administration, Chapter 3: "Starting Up and Shutting Down".
Keyword Phrase
Last Modified Date10/14/2015 1:22 PM

Powered by